\شماره٪٪۱
Hewage, K.N. and Ruwanpura, J.Y. ``Carpentry workers issues
and efficiencies related to construction productivity in commercial
construction projects in Alberta'', {\it Can. J. Civ. Eng}, {\bf 33}(8), pp.
1075-1089 (2006).
\شماره٪٪۲
Galler, M.P., O'Connor, A.C., Dettbarn, J.L. and et al.
``Cost analysis of inadequate interoperability in the US capital
facilities industry'', RTI International Logistics Management
Institute Health, Social, and Economics Research McLean, VA 22102
Research Triangle Park, NC 27709 (2004).
\شماره٪٪۳
Teicholz, P.M. ``Labor-productivity declines in the construction
industry: Causes and remedies (A Second Look)'', {\it AECbytes Viewp}, {\bf
67}, pp. 14-24
(Mar. 14, 2013).
\شماره٪٪۴
Germann, M. ``Influence of project managers on the motivational
factors of a project team'', {\it 13$^{th}$ Int. Conf. Manag. Technol.
IAMOT}, Washington, D.C. (Apr., 2004).
\شماره٪٪۵
Kazemzadeh, R.B. and Hashemi, M.S. ``A study of job motivation
factors in the organization based on the Herzberg theory and
proposing two measurement models for motivation and hygiene factors:
a case study of the oil and energy industrial development company'',
{\it Industrial
Engineering} \& {\it Management Sharif}, {\bf 25}(49), pp. 25-37 (2009).
\شماره٪٪۶
Johari, S. and Jha, K.N. ``Impact of work motivation on construction
labor productivity'', {\it J. Manag. Eng}, {\bf 36}(5) (2020).
\شماره٪٪۷
Phan, P.T., Pham, C.P., Tran, N.T.Q. and et al.
``Factors affecting the work motivation
of the construction project manager'', {\it J. Asian Financ. Econ.
Bus}, {\bf 7}(12), pp. 1035-1043 (2020).
\شماره٪٪۸
Maloney, W.F. and McFillen, J.M. ``Motivational implications
of construction work'', {\it J. Constr. Eng. Manag}, {\bf 112}(1), pp. 137-151
(1986).
\شماره٪٪۹
9. El Sayed, A., \v{S}pago, S., \'{C}atovi\'{c}, F. and et al.
``New approaches and techniques of motivation for construction
industry engineers in B\&H'', {\it Int. Conf. New Technol. Dev. Appl},
Springer, pp. 736-745 (2019).
\شماره٪٪۱۰
Seiler, S., Lent, B., Pinkowska, M. and et al. ``An
integrated model of factors influencing project managers' motivation-Findings
from a swiss survey'', {\it Int. J. Proj. Manag},
{\bf 30}(1), pp. 60-72 (2012).
\شماره٪٪۱۱
Kim, S., Kim, J.-D., Shin, Y. and et al. ``Cultural differences
in motivation factors influencing the management of foreign laborers
in the Korean construction industry'', {\it Int. J. Proj. Manag}, {\bf 33}(7),
pp. 1534-1547 (2015).
\شماره٪٪۱۲
Oyedele, L.O. ``Sustaining architects' and engineers' motivation
in design firms: An investigation of critical success factors'', {\it Eng.
Constr. Archit. Manag}, {\bf 17}(2), pp. 180-196 (2010).
\شماره٪٪۱۳
Damci, A. ``Impact of personal demographics on civil engineers'
motivators: Case study of Turkey'', {\it J. Manag. Eng}, {\bf 32}(2)
(2016).
\شماره٪٪۱۴
Hall, T., Baddoo, N., Beecham, S. and et al.
``A systematic review of theory use in studies investigating
the motivations of software engineers'', {\it ACM Trans. Softw. Eng.
Methodol}, {\bf 18}(3), pp. 1-29 (2009).
\شماره٪٪۱۵
Uwakweh, B.O. ``Motivational climate of construction apprentice'', {\it J.
Constr. Eng. Manag}, {\bf 132}(5), pp. 525-532 (2006).
\شماره٪٪۱۶
Wong, S. and Pang, L. ``Motivators to creativity in the hotel
industry-perspectives of managers and supervisors'', {\it Tour. Manag},
{\bf 24}(5),
pp. 551-559 (2003).
\شماره٪٪۱۷
Yukseloglu, S.M. and Karaguven, M.H. ``Academic motivation
levels of technical high school students'', {\it Procedia-Social Behav.
Sci}, {\bf 106}, pp. 282-288 (2013).
\شماره٪٪۱۸
Greenberg, J., Baron, R.A. and Grover, R.A. ``Behavior in
organizations: Understanding and managing the human side of work'',
{\it Prentice
Hall}, {\bf }, 687 p. (1993).
\شماره٪٪۱۹
Schmid, B. and Adams, J. ``Motivation in project management:
The project manager's perspective'', {\it Proj. Manag. J}, {\bf 39}(2), pp.
60-71 (2008).
\شماره٪٪۲۰
Sansone, C. and Harackiewicz, J.M. ``Intrinsic and extrinsic
motivation: The search for optimal motivation and performance'', Elsevier
(2000).
\شماره٪٪۲۱
Rahimi\'{c}, Z., Resi\'{c}, E. and Ko\v{z}o, A. ``Determining the
level of management competences in the process of employee motivation'',
{\it Procedia-Social
Behav. Sci}, {\bf 41}, pp. 535-543 (2012).
\شماره٪٪۲۲
Daft, R.L. ``Organization theory \& design'', Cengage learning
(2020).
\شماره٪٪۲۳
Maslow, A.H. ``A theory of human motivation'', {\it Psychol. Rev},
{\bf 50}(4),
pp. 370-396 (1943).
\شماره٪٪۲۴
Herzberg, F., Mausner, B. and Snyderman, B. ``Motivation
to work'', John Wiley, New York (1959).
\شماره٪٪۲۵
Alderfer, C.P., {\it Existence, Relatedness, and Growth: Human
Needs in Organizational Settings}, Free Press, the University
of California, 198 p. (1972).
\شماره٪٪۲۶
Adams, J.S. ``Towards an understanding of inequity'', {\it J. Abnorm.
Soc. Psychol}, {\bf 67}(5), pp. 422-436 (1963).
\شماره٪٪۲۷
Vroom, V.H., {\it Work and Motivation}, New York: Wiley, 331 p. (1964).
\شماره٪٪۲۸
Skinner, B.F. ``Contingencies of reinforcement: A theoretical
analysis'', BF Skinner Foundation, Prentice-Hall (2014).
\شماره٪٪۲۹
Locke, E.A. ``Toward a theory of task motivation and incentives'',
{\it Organ.
Behav. Hum. Perform}, {\bf 3}(2), pp. 157-189 (1968).
\شماره٪٪۳۰
Wiley, C. ``What motivates employees according to over 40
years of motivation surveys'', {\it Int. J. Manpow}, {\bf 18}(3), pp. 263-280
(1997).
\شماره٪٪۳۱
Bruton, S.V., Medlin, M., Brown, M. and et al. ``Personal
motivations and systemic incentives: Scientists on questionable
research practices'', {\it Sci. Eng. Ethics},
{\bf 26}(3), pp. 1531-1547 (2020).
\شماره٪٪۳۲
Dwivedula, R. and Bredillet, C.N. ``Profiling work motivation
of project workers'', {\it Int. J. Proj. Manag}, {\bf 28}(2), pp. 158-165
(2010).
\شماره٪٪۳۳
Institute, L.R. ``Do you know your workers' wants'', Foremen
Facts IX, pp. 1-3 (1964).
\شماره٪٪۳۴
Baddoo, D., Ha andll, Jagielska, N.T. ``Software developer
motivation in a high maturity company: a case study'', {\it J. Softw.
Process Improv. Pract}, {\bf 11}(3), pp. 219-228 (2006).
\شماره٪٪۳۵
Jurkiewicz, C.L., Massey Jr, T.K. and Brown, R.G. ``Motivation
in public and private organizations: A comparative study'', {\it Public
Product. Manag. Rev}, {\bf 21}(3), pp. 230-250 (1998).
\شماره٪٪۳۶
Maloney, W.F. ``Productivity improvement: The influence of
labor'', {\it J. Constr. Eng. Manag}, {\bf 109}(3), pp. 321-334 (1983).
\شماره٪٪۳۷
Damci, A., Arditi, D., Polat, G. and et al. ``Motivation
of civil engineers and architects in Turkey'', {\it Organ. Technol.
Manag. Constr. an Int. J}, {\bf 12}(1), pp. 2044-2052 (2020).
\شماره٪٪۳۸
Oyedele, L.O. and Tham, K.W. ``Clients' assessment of architects'
performance in building delivery process: Evidence from Nigeria'', {\it Build.
Environ}, {\bf 42}(5), pp. 2090-2099 (2007).
\شماره٪٪۳۹
Oyedele, L.O. ``Analysis of architects' demotivating factors
in design firms'', {\it Int. J. Proj. Manag}, {\bf
31}(3), pp. 342-354 (2013).
\شماره٪٪۴۰
Shih, T.-H. and Fan, X. ``Response rates and mode preferences
in web-mail mixed-mode surveys: A Meta-Analysis'', {\it Int. J. Internet
Sci}, {\bf 2}(1), pp. 59-82 (2007).
\شماره٪٪۴۱
41. Deutskens, E., De Ruyter, K., Wetzels, M. and et al.
``Response rate and response quality of internet-based surveys:
An experimental study'', {\it Mark. Lett}, {\bf 15}, pp. 21-36 (2004).
\شماره٪٪۴۲
Rayner, J.C.W. and Livingston, G. ``The Kruskal-Wallis tests
are Cochran-Mantel-Haenszel mean score tests'', {\it METRON}, {\bf 78}, pp.
353-360 (2020).