\شماره٪٪۱
Golparvar Fard, M. ``Assessment of collaborative decision-making
in design development and coordination meetings'', Doctoral dissertation,
University of British Columbia (2006).
\شماره٪٪۲
Antunes, R. and Poshdar, M. ``Envision of an integrated information
system for project-driven production in construction'', {\it In Proceedings
of the 26th Annual Conference of the International Group for
Lean Construction: Evolving Lean Construction Towards Mature
Production Management Across Cultures and Frontiers}, Chennai,
India, pp. 134-143 (2018).
\شماره٪٪۳
Eastman, C. ``An outline of the building description system'',
Research Report, Pittsburgh, PA: Institute of Physical Planning,
Carnegie-Mellon University, No. 50 (1974).
\شماره٪٪۴
Van Nederveen, G.A. and Tolman, F.P. ``Modelling multiple
views on buildings'', {\it Automation in Construction}, {\bf 1}(3), pp. 215-224
(1992).
\شماره٪٪۵
Arayici, Y., Coates, P., Koskela, L. and et al.
``Technology adoption in the BIM implementation
for lean architectural practice'', {\it Automation in Construction}, {\bf
20}(2),
pp. 189-195 (2011).
\شماره٪٪۶
Khanzode, A., Fischer, M. and Reed, D. ``Case study of the
implementation of the lean project delivery system (LPDS) using
virtual building technologies on a large healthcare project'',
{\it Proceedings 13th Annual Conference of the International Group
for Lean Construction, IGLC-13}, Sydney, Australia, pp. 153-160
(2005).
\شماره٪٪۷
Smith, P. ``BIM \& the 5D project cost manager'',~Procedia-Social
and Behavioral Sciences, {\bf 119}, pp. 475-484 (2014).
\شماره٪٪۸
Staub-French, S. and Khanzode, A. ``3D and 4D modeling for
design and construction coordination: issues and lessons learned'', {\it
Journal
of Information Technology in Construction (ITcon)}, {\bf 12}(26), pp.
381-407 (2007).
\شماره٪٪۹
Hakkarainen, M., Woodward, C. and Rainio, K. ``Mobile augmented
reality for building and construction'', {\it In Proceedings of the
Mobile World Conference Barcelona}, pp. 4-6 (2010).
\شماره٪٪۱۰
Milgram, P. and Kishino, F. ``A taxonomy of mixed reality
visual displays'', {\it IEICE TRANSACTIONS on Information and Systems},
{\bf 77}(12),
pp. 1321-1329 (1994).
\شماره٪٪۱۱
Golparvar-Fard, M., Pena-Mora, F. and Savarese, S.
``Integrated
sequential as-built and as-planned representation with D 4 AR tools
in support of decision-making tasks in the AEC/FM industry
tools in support of decision-making tasks in the AEC/FM industry'', {\it
Journal
of Construction Engineering and Management}, {\bf 137}(12), pp. 1099-1116
(2011).
\شماره٪٪۱۲
Rankohi, S. and Waugh, L. ``Review and analysis of augmented
reality literature for construction industry'', {\it Visualization
in Engineering}, {\bf 1}(1), pp. 1-18 (2013).
\شماره٪٪۱۳
Ghaffarianhoseini, A., Doan, D., Zhang, T. and et al.
``Integrating Augmented Reality and
Building Information modelling to Facilitate Construction Site
Coordination'', {\it In Proceedings of the 16th International Conference
on Construction Applications of Virtual Reality}, Hong Kong (2016).
\شماره٪٪۱۴
Golparvar-Fard, M., Pena-Mora, F. and Savarese, S.
``D4AR-a 4-dimensional
augmented reality model for automating construction
progress monitoring data collection, processing and communication'',
{\it Journal
of information technology in Construction}, {\bf 14}(13), pp. 129-153
(2009).
\شماره٪٪۱۵
Dias, J.M.S., Capo, A.J., Carreras, J. and et al
``A4D: augmented reality 4D system for architecture and building
construction'', {\it Proceedings of CONVR 2003, 3rd International
Conference on Construction Applications of Virtual Reality}, Virginia
Tech, pp. 71-76 (2003).
\شماره٪٪۱۶
Wang, X., Love, P.E., Kim, M.J. and et al.
``A conceptual framework for integrating building information
modeling with augmented reality'', {\it Automation in Construction}, {\bf 34},
pp. 37-44 (2013).
\شماره٪٪۱۷
Danker, F. and Jones, O. ``Combining augmented reality and
building information modelling-An industry perspective on applications
and future directions'', {\it Proceedings of the 32nd eCAADe Conference,
Department of Architecture and Built Environment, Faculty of
Engineering and Environment, Newcastle upon Tyne}, England, UK,
Newcastle, 2, pp. 525-536 (2014).
\شماره٪٪۱۸
Meza, S., Turk, Z. and Dolenc, M.
``Measuring the potential of augmented reality in civil engineering``
{\it Advances in Engineering Software}, {\bf 90}, pp. 1-10 (2015).
\شماره٪٪۱۹
Heinzel, A., Azhar, S. and Nadeem, A. ``Uses of augmented
reality technology during construction phase'', {\it In: The 9th International
Conference on Construction in the 21st Century (CITC-9), Revolutionizing
the Architecture, Engineering and Construction Industry through
Leadership, Collaboration and Technology}, Dubai, United Arab
Emirates (2017).
\شماره٪٪۲۰
van Berlo, L., Helmholt, K.A. and Hoekstra, W. ``C2B: augmented
reality on the construction site'', {\it In: Proceedings of the 9th
International Conference on Construction Applications of Virtual
Reality (conVR2009)}, pp. 295-304 (2009).
\شماره٪٪۲۱
Wang, X. and Dunston, P.S. ``Design, strategies, and issues
towards an augmented reality-based construction training platform'',
{\it Journal
of Information Technology in Construction (ITcon)}, {\bf 12}(25), pp.
363-380, (2007).
\شماره٪٪۲۲
Akyeampong, J., Udoka, S.J. and Park, E.H. ``A hydraulic
excavator augmented reality simulator for operator training'',
{\it In Proceedings of the 2012 International Conference on Industrial
Engineering and Operations Management, IEOM Society}, Istanbul,
Turkey, pp. 1511-1518 (2012)
\شماره٪٪۲۳
Kivrak, S. and Arslan, G. ``Using augmented reality to facilitate
construction site activities'', in Advances in Informatics and
Computing in Civil and Construction Engineering, Springer, pp.
215-221 (2019).
\شماره٪٪۲۴
Park, C.S. and Kim, H.J. ``A framework for construction safety
management and visualization system'', {\it Automation in Construction},
{\bf 33},
pp. 95-103 (2013).
\شماره٪٪۲۵
Zaher, M., Green