Document Type : Article
Authors
School of Mining, Petroleum and Geophysics Engineering, University of Shahrood
Abstract
Keywords
Main Subjects
Mahmoodzadeh, A. , Zare, S. and Daraii, R. (2017). REDUCING THE TIME AND COST UNCERTAINTY OF TUNNELING PROJECTS USING DAT METHOD CASE STUDY: HAMRO ROAD TUNNEL IN IRAN. Sharif Journal of Civil Engineering, 33.2(3.1), 83-93. doi: 10.24200/j30.2017.20072
Mahmoodzadeh, A. , , Zare, S. , and Daraii, R. . "REDUCING THE TIME AND COST UNCERTAINTY OF TUNNELING PROJECTS USING DAT METHOD CASE STUDY: HAMRO ROAD TUNNEL IN IRAN", Sharif Journal of Civil Engineering, 33.2, 3.1, 2017, 83-93. doi: 10.24200/j30.2017.20072
Mahmoodzadeh, A., Zare, S., Daraii, R. (2017). 'REDUCING THE TIME AND COST UNCERTAINTY OF TUNNELING PROJECTS USING DAT METHOD CASE STUDY: HAMRO ROAD TUNNEL IN IRAN', Sharif Journal of Civil Engineering, 33.2(3.1), pp. 83-93. doi: 10.24200/j30.2017.20072
A. Mahmoodzadeh , S. Zare and R. Daraii, "REDUCING THE TIME AND COST UNCERTAINTY OF TUNNELING PROJECTS USING DAT METHOD CASE STUDY: HAMRO ROAD TUNNEL IN IRAN," Sharif Journal of Civil Engineering, 33.2 3.1 (2017): 83-93, doi: 10.24200/j30.2017.20072
Mahmoodzadeh, A., Zare, S., Daraii, R. REDUCING THE TIME AND COST UNCERTAINTY OF TUNNELING PROJECTS USING DAT METHOD CASE STUDY: HAMRO ROAD TUNNEL IN IRAN. Sharif Journal of Civil Engineering, 2017; 33.2(3.1): 83-93. doi: 10.24200/j30.2017.20072