\شماره٪٪۱
Noori, S. and Faraji, H. ``Assessment of effective factors
in construction project delays and presenting a model for reducing
delay, {\it 5th International Project Manamgement Conference, Ariana
Research and Industrial Group}, Tehran, Aug. 11 and 12, (2009).
\شماره٪٪۲
Khoshgoftar, M., Bakar, A.H.A. and Osman, O. ``Causes
of delays in Iranian construction projects'', {\it International Journal
of Construction Management}, {\bf 10}(2), 53-69 (2010).
\شماره٪٪۳
Safavi, S.A., Shayanfar, M., NasrAzadani, S.M. and et al.
``Assesment of delays in urban construction considering
different effective factors'', {\it 6th International Project Management
Conference, Ariana Research and Industrial Group}, Tehran, Jan.
16 and 17, (2011).
\شماره٪٪۴
Shakeri, E., Ettehadi, S. and Amiri, O. ``Assessment
of project delays and their related costs and and presenting
proper mitigation strategies (with a focus on Golestan province
projects in department of road and urban development)'', {\it 1st National
Conference on Construction Project Management}, Mashad, Oct. 30
and 31, 2013.
\شماره٪٪۵
Fallahnejad, M.H. ``Delay causes in Iran gas pipeline
projects'', {\it International Journal of Project Management}, {\bf 31}(1),
pp. 136-146 (2013).
\شماره٪٪۶
Rafieizonooz, M., Salim, M.R., Khankhaje, E. and et al.
Determining the causes of delay
by using factor analysis in Tehran's construction projects'', {\it Applied
Mechanics and Materials}, {\bf 735}, p. 109 (2015).
\شماره٪٪۷
Samarghandi, H, MoosaviTabatabaei, S.M., Taabayan, P. and et al.
``Studying the reasons for delay and
cost overrun in construction projects: The case of Iran'', {\it Journal
of Construction in Developing Countries}, {\bf 21}(1), pp. 51-84 (2016).
\شماره٪٪۸
Barzegar, M.R. ``25 Percent of Country's Construction
Project are Low in Quality. Mehr News Agency, News Code: 680475'',
(May 10, 2008).
\شماره٪٪۹
Tabnak News Agency Parand Subburb Complain on the
Quality of Mehr Residentials. Tabnak News Agency, News Code:
352192, (Oct. 20, 2013).
\شماره٪٪۱۰
Heydari, H. ``Ahvaz construcion projects are low in
quality'', Keyhan News Service, News Code: 13162, May 18, 2014.
\شماره٪٪۱۱
Khanjani, H. and Shakeri, E. ``Diagnosing quality management
issues in urban projects'', 2nd Internationa Urban Management Congress,
Sari, Iran, (Nov. 19 and 20, 2014).
\شماره٪٪۱۲
AslShirin, S. ``Diagnosing design, monitoring and construction
of rural buildings: The case of Malayer county'', {\it 1$^{st}$ Specialized
Conference of Architecture and Urban Development of Iran, Kharazmi
Higher Education}, Shiraz, Iran, (Jun 16, 2015).
\شماره٪٪۱۳
Shakeri, E. and Ghorbani, A. ``Identifying major claims
of construction project contractors'', {\it 2nd International Project
Manamgement Conference, Ariana Research and Industrial Group},
Tehran, Iran, (Mar. 5-6, 2006).
\شماره٪٪۱۴
HashemiNasab, S.H., Mortaheb, M.M. and Ahmadian, A.
``Causes of common and frequent claims in oil, gas and petrochemical
projects of Iran'', {\it KSCE Journal of Civil Engineering},
{\bf 18}(5), pp. 1270-1278 (2014).
\شماره٪٪۱۵
Keyvani, B. and AmirEbrahimi, A.M. ``Identifying claims
raised by different stakeholders in constrcution contracts of
Iran and analyzing their causes'', {\it Journal of Project Management}
{\bf 6}, pp. 2-13 (Summer and Fall 2007).
\شماره٪٪۱۶
Charkhsaz, F. and Rezvanian, O. Claim management
assessment in industrial contracts of Iran; case studey of petrochemical
industry'', {\it 5th International Management Conference}, Tehran,
Iran (Dec. 18-20,
2007).
\شماره٪٪۱۷
Shakeri, E. and Bagherian Marandi, N. ``Case study of
conventional construction constracts; diagnosing claim causes'',
{\it 5th International Project Management Conference}, Tehran,
Iran (Aug. 11-12,
2009).
\شماره٪٪۱۸
Shakeri, E. and Ketabi, M.S. ``Diagnosing root causes
of constructors claims; preventing claims from the bidding stage'',
{\it 7th International Project Management Conference}, Tehran
Iran (Jan. 4-5, 2012).
\شماره٪٪۱۹
Asadi Zeydabadi, M.H. and Asadi Zeydabadi, M. ``Identifying
contractual claims on clause 17 of general condition of public
construction contracts'', {\it 1st International Conference on Human
Architecture, Civil Engineering and City ICOHACC 2015},
Tabriz, Iran (June 2015).
\شماره٪٪۲۰
Asadi Zeydabadi, M.H. and Asadi Zeydabadi, M. ``Investigating
contractual disputes on clauses 36 and 37 of general condition
of public construction contracts'', {\it 1st International Conference
on Human, Architecture, Civil Engineering and City ICOHACC 2015},
Tabriz, Iran (June 2015).
\شماره٪٪۲۱
Sobhieh, M.H., Azizi, M. and GhanbarGorkani, M. ``Investigating
contractual claim causes in Tehran's urban railway'', {\it 12th Interntional
Project Management Conference}, Tehran, Iran (Feb 12-13, 2017).
\شماره٪٪۲۲
Shakeri, E. and Sayadi, H.R. ``Identifying and investigating
delay and cost overrun factors in industrial projects of Iran
- case study of Khoozestal steel mill expansion projects'', {\it 2nd
National Construction Engineering and Management Conference},
Amirkabir University of Technology, BandarAbbas
Branch, Iran (May 2-3 2012).
\شماره٪٪۲۳
RoozKhosh, F. ``Reasons of increased cost in construction
Projects'', Sakht-o-Saz Monthly, (Nov. 2012).
\شماره٪٪۲۴
TaheriAmiri, M. and Nazarpour, H. ``Identifying reasons
of construction project cost overrun using FMEA method and presenting
mitigation methods'', 8th National Civil Engineeing Congress, Anooshiravan
University of Technology, Babol, (May 7 and 8, 2014).
\شماره٪٪۲۵
Shahsavari, E. and HoseinAlipour, M. ``Asseesment of
cost overrun in Tehran's construction projects'', 4th National
Value Engineering and Cost Management, Tehran, (Dec. 1 and 2,
2014).
\شماره٪٪۲۶
Derakhshanalavijeh R. and CardosoTeixeira J.M. Cost
overrun in construction projects in developing countries'', {\it Gas-Oil
Industry of Iran, Journal of Civil Engineering and Management},
{\bf 23(1)}, pp. 125-136 (2017).
\شماره٪٪۲۷
Management and Planning Organization of Iran Technical
and Executive System of Iran, Official Newspaper,
Government Approval No. 33497T/42339 (July 16, 2006).
\شماره٪٪۲۸
Hallaj Neyshaboori, S. and Yazdani, Z. ``Urban contruction
project management under Iran's technical and executive system'',
{\it National Conference of Urban Technical and Executive System Development},
Center of Technologcal Studies, Sharif University of Technology,
Tehran, Iran (May 16-17, 2007).
\شماره٪٪۲۹
Najafi, M.A. ``Agreement, general condition andd private
condition of construction contracts'', {\it Management and Planning
Organization Magazin}, {\bf 4311}(843/54-1088/2-1) (May 24,
1999).
\شماره٪٪۳۰
ParchamiJalal, M. and Adlpoor, M.R. ``Essential challenges
in public construction contract clauses'', {\it 1st Conference on Improvement
of Constrcution Industry in Iran, Sharif Univeristy of Technology},
Tehran, Iran, (Feb 15-16, 2006).
\شماره٪٪۳۱
Saeb, A. and Hoseinalipoor, S.M. ``Interpreting termination
and suspention clauses of public construction contracts of Iran.
closure'', {\it 4th International Project Management Conference, Aug},
Tehran, Iran pp. 19-20, (2007).
\شماره٪٪۳۲
ParchamiJallal, M. and Saghi, B. ``Investigating contractual
risk allocation in public design-bid-build projects'', {\it Journal
of Fine Arts - Architecture and Urbanization (in Farsi)}, University
of Tehran, {\bf 3}(46), pp. (2011).
\شماره٪٪۳۳
Sebt, M.H., Afshar, M.R. and Amiri, O. ``Investigating
contractural risk allocation among project stakeholders in public
design-bid-build projects'', {\it 2nd National Construction Engineering
and Management Conference}, Amirkabir University
of Technology, BandarAbbas branch, Iran (May 2-3, 2012).
\شماره٪٪۳۴
Shakeri, E., Jahanara, S.S. and Ghobadi, M. ``Diagnosing
contractual issues in public constrcution projects'', {\it International
Conference on Civil Engineering Architecture and Urban Infrastructure},
Tabriz, Iran, (29-30 July 2015).
\شماره٪٪۳۵
Sajedi, S.F. and Hamzepoor, M. ``Assessment of clause
48 of public construction project contract and comparing it with
related FIDIC uniform contract'', {\it 3rd National and 1st International
Conference in Applied Research on Civil Engineering}, Architecture
and Urban Planning, (10-11 Mar. 2016).
\شماره٪٪۳۶
Alvanchi, A., Farahmand, H., SeyrFar, A. and et al.
``Investigating contractual risk allocation differences
between Iran's public construction uniform contract and FIDIC's
red book'', 10th National Civil Engineering Congress,
Tehran, Iran (April 19-20, 2017).
\شماره٪٪۳۷
Sterman, J.D. ``Reference: Business dynamics: System
thinking and modeling for a complex world'', USA: McGraw-Hill
Higher Education (2000).
\شماره٪٪۳۸
Aref, M. ``Uniform contract of consulting services''.,
{\it Management and Planning Organization Magazin}, {\bf 4318}(
2460/54-842/105), pp. (Jul. 19, 2000).
\شماره٪٪۳۹
PMI (project management institute). ``A Guide to the project
management body of knowledge - PMBOK guide'', Published by: Project
Management Institute, Inc, ISBN: 978-1-935589-67-9, USA, Pennsylvania,
(2013).
\شماره٪٪۴۰
CMAA (Construction Management Association of America). ``An
Owner's Guide to Project Delivery Methods'', McLean, USA, Virginia,
(2012).
\شماره٪٪۴۱
Coyle, G. ``Qualitative and quantitative modelling
in system dynamics: Some research questions''., {\it System Dynamics},
{\bf 16}(3), pp. 225-244 (2000).
\شماره٪٪۴۲
Ackermann, F. and Alexander, J. ``Researching complex
projects: Using causal mapping to take a systems perspective'',
{\it International Journal of Project Management}, {\bf
34}, pp. 891-90 (2016).
\شماره٪٪۴۳
Aiyetan O.A. and Dillip, D. ``Resolving contractor
commitment challenges in project delivery by using concetpual
system dynamics models'', {\it Journal of Construction Project Management
and Innovation}, {\bf 6}, pp. 1563-1582 (2016).
\شماره٪٪۴۴
Chitongo A.M. and Pretorius L. ``Competition among
project participants: a preliminary system dynamics conceptual
model'',
{\it 12th INCOSE SA Systems Engineering Conference, ISBN 978-0-620-72719-8},
pp. 120-134 (2016).
\شماره٪٪۴۵
Das, D.K. and Emuze, F. ``A dynamic model of contractor
induced delays in India'', {\it Journal of Construction in Developing
Countries}, {\bf 22}(1), pp. 21-39 (2017).
\شماره٪٪۴۶
Lingard, H. and Turner, M. ``Promoting construction
workers' health: a multi-level sy