\شماره٪٪۱
Odesola, Okolie, Nnametu, ``A Comparative evaluation of labour
productivity of wall plastering activity using work study,'' {\it PM
World Journal} (2015).
\شماره٪٪۲
Soham, M. and Rajiv, B.``Critical factors affecting labour
productivity in construction projects: case study of south gujarat
region of india'', {\it International Journal of Engineering and Advanced
Technology}, pp. 1-9 (2013).
\شماره٪٪۳
Nasirzadeh, F. and Nojedehi, P.``Dynamic modeling of
labor productivity in construction projects'', {\it International Journal
of Project Management} (2013).
\شماره٪٪۴
Adnan Enshassi et al, ``Factors affecting labour productivity
in building projects in the gaza strip'', {\it Journal of Civil Engineering
and Management}, pp. 1-11 (2007).
\شماره٪٪۵
Absalom H. , Lamka, V. and et al, ``Factors influencing effective
productivity on construction sites in nairobi county'', {\it International
Journal of Soft Computing and Engineering (IJSCE)}, pp. 1-7 (2014).
\شماره٪٪۶
Shashank K, et al., ``Analysis of key factors affecting the
variation of labour productivity in construction project'', {\it International
Journal of Emerging Technology and Advanced Engineering} (2014).
\شماره٪٪۷
Naoum, S. G. ``Factors influencing labor productivity on
construction sites'', {\it International Journal ofProductivity and
Performance Management}, pp. 401-421 (2015).
\شماره٪٪۸
Shabir Hussain Khahro, et al., ``Improving labour productivity:
an attribute case study of building sector projects in pakistan,''
{\it International
Journal of Applied Engineering Research} (2016).
\شماره٪٪۹
Vishal Sherekar, Mahesh Tatikonda, ``Impact of factor affecting
on labour productivity in construction projects by AHP method'',
{\it International
Journal of Engineering Science and Computing} (2016).
\شماره٪٪۱۰
Thomas, H. Randolph, David R. Riley, and Victor E. Sanvido.,
``Loss of labor productivity due to delivery methods and weather.'',
{\it Journal
of Construction Engineering and Management}, pp. 39-46, (1999).
\شماره٪٪۱۱
Ibbs, William, ``Impact of change's timing on labor productivity,''
{\it Journal
of Construction Engineering and Management}, pp. 1219-1223 (2005).
\شماره٪٪۱۲
Hanna, Awad S., Craig, S., Taylor, and et al.
``Impact of extended overtime on construction labor productivity.'',
{\it Journal
of Construction Engineering and Management} , pp. 734-739 (2005).
\شماره٪٪۱۳
Hanna, Awad S., et al., ``Impact of overmanning on mechanical
and sheet metal labor productivity'', {\it Journal of Construction
Engineering and Management} , pp. 22-28 (2007).
\شماره٪٪۱۴
Hanna, Awad S., et al., ``Impact of shift work on labor
productivity for labor intensive contractor.'' {\it Journal of construction
engineering and management}, pp. 197-204 (2008).
\شماره٪٪۱۵
James M., Lyneisa and David N. Ford, ``System dynamics applied
to project management: a survey, assessment,and directions for
future research'', {\it System Dynamic Review}, pp. 157-189 (2007).
\شماره٪٪۱۶
Sangwon Han et al., ``A system dynamics model
for assessing the impacts of design errors
in construction projects'', {\it Mathematical
and Computer Modelling} (2011).
\شماره٪٪۱۷
Jadranko Izetbegovi\'{c}a, Maja-Marija Nahod, ``The impact
of the additional workload on the productivity inconstruction projects'',
{\it Creative Construction} (2014).
\شماره٪٪۱۸
Xiaodong Li a, et al, ``Evaluating the impacts of high-temperature
outdoor working environments on construction labor productivity
in China: A case study of rebar workers,'' {\it Building and
Environment}, pp. 42-52
(2015).
\شماره٪٪۱۹
Mathew Chalker and Martin Loosemore, ``Trust and productivity
in Australian construction projects:a subcontractor perspective,''
{\it Engineering,
Construction and Architectural Management}, pp. 192-210 (2015).
\شماره٪٪۲۰
Zairra Mat Jusoh, Narimah Kasim, ``A review on implication of
material management to project performance,''
{\it MATEC Web of conferences} (2016).
\شماره٪٪۲۱
Aborizak, herman, ``Estimating labor productivity using probability
infrence neural network,'' {\it Computing in Construction} (2000).
\شماره٪٪۲۲
zayed, halpin, ``Pile construction productivity assessment,'' {\it jounal
of construction engineering and management} (2005).
\شماره٪٪۲۳
Ali,zayed, hegab, ``Modelling the effect of subjective factor
on productivity of trenchless technology application to buried
infrustructre systems,'' {\it Journal of Construction Engineering and
Management} (2007).
\شماره٪٪۲۴
song, aborizak, ``Measuring and modeling labor productivity
using historical data,'' {\it Journal of Construction Engineering and
Management} (2008).
\شماره٪٪۲۵
Moselhi, khan, ``Analysis of labour productivity of formwork
operation in building construction,''{\it Construction Ennovation}
(2010).
\شماره٪٪۲۶
park, kim,yoon, nepal, ``Schaduling desicions and thier
consequences on construction perfomance,'' {\it Ksce Journal of Civil
Engineering} (2010).
\شماره٪٪۲۷
Saad Al-jibour, Michael, J. and Mawdesley. ``Modelling construction
project productivity using systems dynamics approach,'' {\it International
Journal of Productivity and Performance Management}, pp. 18-36 (2009).
\شماره٪٪۲۸
Homyun Jang, et al., ``Labour productivity model for reinforced
concrete construction projects,''
{\it Construction Innovation}, pp. 92-113 (2011).
\شماره٪٪۲۹
Farid Mirahadi , Tarek Zayed., ``Simulation-based construction
productivity forecast using neural-network-driven fuzzy reasoning,''
{\it Automation
in Construction} (2016).
\شماره٪٪۳۰
Shabbab, A. ``Neural network based linear regression model
for modeling productivity construction in saudi arabia,'' {\it International
Journal of Emerging Trends in Engineering and Development} (2016).
\شماره٪٪۳۱
sterman, {\it Business Dynamics: Systems Thinking An Modeling
For a Complex World, Boston: Mc Grow Hill} (2000).
\شماره٪٪۳۲
Han,S., Lee, S. and Park, M.``Dynamic project management: an
application of system dynamics in construction engineering and
management,'' {\it Intelligent Systems}, (2014).
\شماره٪٪۳۳
Long Duy Nguyen, Stephen O. Ogunlana, ``Modeling the dynamics
of an infrastructure project,'' {\it Computer-Aided Civil and Infrastructure
Engineering}, pp. 265-279, (2005).
\شماره٪٪۳۴
Olatunji A. AIYETAN and Dillip DAS, ``Using system dynamics
modeling principles to resolve problem of rework in construction
projects in Nigeria,'' '{\it construction project mangement and innovation}
(2015).
\شماره٪٪۳۵
Suinan, Li., ``A generic model of project management with Vensim'',
{\it Faculty of Engineering and Science} (2008).
\شماره٪٪۳۶
Nuria Forcada, et al., ``Rework in highway projects,'' {\it Journal
of Civil Engineering and Management}, pp. 455-470 (2014).
\شماره٪٪۳۷
Arman Sadreddin, Rema Sawan and Andrea Schiffauerova, ``Using
system dynamics approach to model cost of quality in the procurement
process of the construction industry,'' {\it Concordia Institute for
Information Systems Engineering} (2012).
\شماره٪٪۳۸
Nasirzadeh, F. and et al., ``Modeling quality management in construction
projects,'' {\it International Journal of Civil Engineering}, pp. 1-14
(2012).
\شماره٪٪۳۹
Michael J. Mawdesley Saad Al-Jibouri, ``Modelling construction
project productivity using systems dynamics approach,'' {\it International
Journal of Productivity and Performance Management}, pp. 1-24 (2010).
\شماره٪۴۰
Mingyu Shina, et al., ``A system dynamics approach for modeling
construction workerssafety attitudes and behaviour,'' {\it Accident
Analysis and Prevention}, pp. 1-11 (2013).
\شماره٪٪۴۱
David Arditi , Shruti Nayak and Atilla Damci, ``Effect of
organizational culture on delay in construction,'' {\it International
Journal of Project Management}, pp. 136-147 (2017).
\شماره٪٪۴۲
Abraham Assefa Tsehayae and Aminah Robinson Fayek, ``System
model for analysing construction labour productivity,'' {\it Construction
Innovation} (2016).
\شماره٪٪۴۳
Chul-Ki Chang and Sungkwon Woo, ``Critical review of previous
studies on labor productivity loss due to overtime,'' {\it KSCE Journal
of Civil Engineering}, pp. 1-7 (2017).
\شماره٪٪۴۴
Dushyant, A. Deshmukh, Parag. and Mahatme, S. ``Assessment of factors
affecting productivity of excavator'', {\it International Journal of
Advance Engineering and Research Development}, pp. 1-8, (2016).
\شماره٪٪۴۵
Rachel L., Yim,Jason M., Castaneda,Toni L. and et al.
``Exploring the relationship between rework
projects and risk indicators,''
{\it Project Management Journal}, pp. 63-75 (2015).
\شماره٪٪۴۶
Almazyed, K. and et al., ``Study on the key factor parameters
to increase productivity in construction and manufacturing industries.,''
{\it Materials Science and Engineering} (2016)