\شماره٪٪۱
Olawale, Y.A. and Sun, M. ``Cost and time control of construction
projects: inhibiting factors and mitigating measures in
practice'', {\it Construction
Management and Economics}, {\bf 28}(5), pp. 509-526 (2010).
\شماره٪٪۲
Ahmed, S.M., Azhar, S., Castillo, M. and et al.
``Construction delays in florida: an empirical study, Final report'',
Department of Community Affairs, Florida, US (2002).
\شماره٪٪۳
Flyvbjerg, B., Skamris Holm, M.K. and Buhl, S.L. ``What causes
cost overrun in transport infrastructure projects'', {\it Transport
Reviews}, {\bf 24}(1), pp. 3-18 (2004).
\شماره٪٪۴
Odeck, J. ``Cost overruns in road construction-what are their
sizes and determinants'', {\it Transport policy}, {\bf 11}(1), pp. 43-53
(2004).
\شماره٪٪۵
Love, P., Sing, C., Wang, X. and et al.
``Overruns in transportation infrastructure projects'', {\it Struct.
Infrastruct. Eng}, {\bf 10}(2), pp. 141-159 (2014).
\شماره٪٪۶
Memon, A.H., Rahman, I.A., Zainun, N.Y. and et al.
``Web-based risk assessment technique for time and cost overrun
(WRATTCO)-A framework'', {\it Procedia-Social and Behavioral Sciences},
{\bf 129},
pp. 178-185 (2014).
\شماره٪٪۷
Okunlola Ojo, S., Aina, O. and Yakeen Adeyemi, A., ``A comparative
analysis of the performance of traditional contracting and design-build
procurements on client objectives in Nigeria'', {\it Journal of Civil
Engineering and Management}, {\bf 17}(2), pp. 227-233 (2011).
\شماره٪٪۸
Kazaz, A., Ulubeyli, S. and Tuncbilekli, N. A. ``Causes of
delays in construction projects in Turkey'', {\it Journal of Civil
Engineering and Management}, {\bf 18}(3), pp. 426-435 (2012).
\شماره٪٪۹
Dey, P.K., Tabucanon, M.T. and Ogunlana, S. O. ``Petroleum
pipeline construction planning: a conceptual framework'', {\it International
Journal of Project Management}, {\bf 14}(4), pp. 231-240 (1996).
\شماره٪٪۱۰
Derakhshanalavijeh, R. and Teixeira, J.M.C., ``Cost overrun
in construction projects in developing countries, gas-oil industry
of Iran as a case study'',
{\it Journal of Civil Engineering and Management}, {\bf 23}(1),
pp. 125-136 (2017).
\شماره٪٪۱۱
Parchami Jalal, M. and Shoar, S. ``A hybrid SD-DEMATEL approach
to develop a delay model for construction projects'', {\it Engineering,
Construction and Architectural Management}, {\bf 24}(4), pp. 629-651
(2017).
\شماره٪٪۱۲
Okpala, D.C. and Aniekwu, A.N. ``Causes of high costs of
construction in Nigeria'', {\it Journal of Construction Engineering
and Management}, {\bf 114}(2), pp. 233-244 (1988).
\شماره٪٪۱۳
Kaming, P.F., Olomolaiye, P.O., Holt, G.D. and et al.
``Factors influencing construction time and cost overruns on
high-rise projects in Indonesia'', {\it Construction Management} \&
{\it Economics}, {\bf 15}(1), pp. 83-94 (1997).
\شماره٪٪۱۴
Jackson, S.``Project cost overruns and risk
management'', {\it In Proceedings of Association of Researchers in
Construction Management 18th Annual ARCOM Conference}, Newcastle,
Northumber University, UK pp. 2-4 (2002).
\شماره٪٪۱۵
Creedy, G. ``Risk factors leading to cost overrun in highway
projects'', Sidwell, A.C. (Ed.). {\it Proceeding of Queenland University
of Technology Research Week International Conference}, Brisbane,
Australia (2005).
\شماره٪٪۱۶
Frimpong, Y., Oluwoye, J. and Crawford, L. ``Causes of delay
and cost overruns in construction of groundwater projects in
a developing countries; Ghana as a case study'', {\it International
Journal of Project Management}, {\bf 21}(5), pp. 321-326 (2003).
\شماره٪٪۱۷
Koushki, P.A., Al
Rashid, K. and Kartam, N. ``Delays and
cost increases in the construction of private residential projects
in Kuwait'', {\it Construction Management and Economics}, {\bf
23}(3), pp. 285-294
(2005).
\شماره٪٪۱۸
Azhar, N., Farooqui, R.U. and Ahmed, S.M. ``Cost overrun
factors in construction industry in Pakistan'', {\it Proceeding of
first International Conference on Construction in Developing
Countries (ICCIDE-1)}, Karachi, Pakistan, 4-5 August 2008 pp.
499-508 (2009).
\شماره٪٪۱۹
Kaliba, C., Muya, M. and Mumba, K. ``Cost escalation and
schedule delays in road construction projects in Zambia'', {\it International
Journal of Project Management}, {\bf 27}(5), pp. 522-531 (2009).
\شماره٪٪۲۰
Enshassi, A., Kumaraswamy, M. and Al-Najjar, J. ``Significant
factors causing time and cost overruns in construction projects
in the Gaza Strip: Contractors' perspective'', {\it International Journal
of Construction Management}, {\bf 10}(1), pp. 35-60 (2010).
\شماره٪٪۲۱
Niazi, G.A. and Painting, N. ``Significant factors causing
cost overruns in the construction industry in Afghanistan'', {\it Procedia
Engineering}, {\bf 182}, pp. 510-517 (2017).
\شماره٪٪۲۲
Abderisak Adam, ``Aggregation of factors causing cost overruns
and time delays in large public construction projects Trends
and implications'', {\it Eng. Constr. Archit. Manag}. {\bf 24}(3),
2017 pp. 393-406 (2017). DOI 10.1108/ECAM-09-2015-0135
\شماره٪٪۲۳
Alvanchi, A., Lee, S. and AbouRizk, S. ``Dynamics of working
hours in construction'', {\it Journal of Construction Engineering and
Management}, {\bf 138}(1), pp. 66-77 (2011).
\شماره٪٪۲۴
Sterman, J.D. ``Business dynamics: systems thinking and modeling
for a complex world'', (2002).
\شماره٪٪۲۵
Rodrigues, A. and Bowers, J. ``The role of system dynamics
in project management'',
{\it International Journal of Project Management}, {\bf 14}(4),
pp. 213-220 (1996).
\شماره٪٪۲۶
Lin, C.L. and Tzeng, G.H. ``A value-created system of science
(technology) park by using DEMATEL'',
{\it Expert Systems With Applications}, {\bf 36}(6),
pp. 9683-9697 (2009).
\شماره٪٪۲۷
Tsai, W.H. and Hsu, W. ``A novel hybrid model based on DEMATEL
and ANP for selecting cost of quality model development'', {\it Total
Quality Management}, {\bf 21}(4), pp. 439-456 (2010).
\شماره٪٪۲۸
Li, C.W. and Tzeng, G.H. ``Identification of a threshold
value for the DEMATEL method using the maximum mean de-entropy
algorithm to find critical services provided by a semiconductor
intellectual property mall'', {\it Expert Systems with Applications},
{\bf 36}(6),
pp. 9891-9898 (2009).
\شماره٪٪۲۹
Memon, A.H., Abdul Rahman, I. and Abdul Azis, A.A. ``Preliminaries study
on causative factors leading to construction cost overrun'',
{\it Int. J. Sustain.
Constr. Eng. Technol}, {\bf 2}(1), pp. 57-71 (2011).
\شماره٪٪۳۰
Rahman, I.A., Memon, A.H. and Karim, A.T.A. ``Significant factors
causing cost overruns in large construction projects in Malaysia'',
{\it J. Appl.
Sci}, {\bf 13}(2), pp. 286-293 (2013).
\شماره٪٪۳۱
Sohu, S., Abd Halid, A., Nagapan, S. and et
al.
``Causative factors of cost overrun in highway projects of Sindh province of
Pakistan'', {\it IOP Conf. Ser. Mater. Sci. Eng}, {\bf 271}(1) (2017).
\شماره٪٪۳۲
Wanjari, S.P. and Dobariya, G. ``Identifying factors causing cost overrun
of the construction projects in India'',
{\it Sadhana - Acad. Proc. Eng. Sci}, {\bf
41}(6), pp. 679-693 (2016).