\شماره٪٪۱
Yu, H., Al-Hussein, M., Al-Jibouri, S. and et al. ``Lean
transformation in a modular building company: a case for
implementation'', {\it Journal
of Management in Engineering}, {\bf 29}(1), pp. 103-111 (2013).
\شماره٪٪۲
Castillo, G., Alarc\'{o}n, L.F.
and Gonz\'{a}lez, V.A.
``Implementing
lean production in copper mining development projects: case study'',
{\it Journal
of Construction Engineering and Management}, {\bf 141}(1), 05014013
(2015).
\شماره٪٪۳
Yu, H., Tweed, T., Al-Hussein, M. and et al. ``Development
of lean model for house construction using value stream mapping'', {\it Journal
of Construction Engineering and Management}, {\bf 135}(8), pp. 782-790
(2009).
\شماره٪٪۴
Al-Bataineh, M., AbouRizk, S. and Parkis, H. ``Using simulation
to plan tunnel construction'', {\it Journal of Construction Engineering
and Management}, {\bf 139}(5), pp. 564-571 (2013).
\شماره٪٪۵
Tommelein, I.D. ``Pull-driven scheduling for pipe-spool installation:
simulation of lean construction technique'', {\it Journal of Construction
Engineering and Management}, {\bf 124}(4), pp. 279-288 (1998).
\شماره٪٪۶
Vieira, A. and Cachadinha, N. ``Lean construction and
sustainability-complementary
paradigms-a case study'', IGLC-19, pp. 611-621 (2011).
\شماره٪٪۷
Tezel, A., Koskela, L. and Aziz, Z. ``Current condition and
future directions for lean construction in highways projects:
a small and medium-sized enterprises (SMEs) perspective'', {\it International
Journal of Project Management}, {\bf 36}(2), pp. 267-286 (2018).
\شماره٪٪۸
Koskela, L., {\it Application of the New Production Philosophy
To Construction}, Technical Report, Stanford, Stanford University,
TR072 (1992).
\شماره٪٪۹
Valtolina, G. ``The machine that changed the world'', The Triumph
of Lean Production, La macchina che ha cambiato il mondo, pp.
337-339 (1994).
\شماره٪٪۱۰
Barlow, J., Childerhouse, P., Gann, D. and et al.
``Choice and delivery in housebuilding: lessons
from japan for UK housebuilders, {\it Building Research} \&
{\it Information}, {\bf 31}(2),
pp. 134-145 (2003).
\شماره٪٪۱۱
Sadeghi, R., Taghaddos, H. and Eskandar, H. ``Lesson learned
from semi-automated last planner system (LPS) implementation'',
{\it International Congress of Civil Engineering} (2018).
\شماره٪٪۱۲
Faghfouri, A. ``Evaluating lean thinking in construction
project'', Civil Engineering, Architecture and Urban Development, (In Persian)
(2017).
\شماره٪٪۱۳
Innella, F., Arashpour, M. and Bai, Y. ``Lean methodologies
and techniques for modular construction: chronological and critical
Review'', {\it Journal of Construction Engineering and Management},
{\bf 145}(12),
04019076 (2019).
\شماره٪٪۱۴
Bamana, F., Lehoux, N. and Cloutier, C. ``Simulation of a
construction project: assessing impact of just-in-time and lean
principles'', {\it Journal of Construction Engineering and Management},
{\bf 145}(5),
05019005 (2019).
\شماره٪٪۱۵
BuHamdan, S., Alwisy, A., Bouferguene, A. and et al.
``Novel approach to overcoming discontinuity in knowledge:
application in value-adding frameworks in construction industry'', {\it Journal
of Construction Engineering and Management}, {\bf 145}(8), 04019045
(2019).
\شماره٪٪۱۶
Halpin, D.W. ``Cyclone-method for modeling job site processes'', {\it Journal
of the Construction Division}, {\bf 103}(3), pp. 489-499 (1977).
\شماره٪٪۱۷
Chang, D.Y. and Carr, R.I. ``RESQUE: a resource oriented
simulation system for multiple resource constrained processes'',
{\it In Proceedings of the PMI Seminar/Symposium}, pp. 4-19 (1987).
\شماره٪٪۱۸
Lu, M. ``Simplified discrete-event simulation approach for
construction simulation'', {\it Journal of Construction Engineering
and Management}, {\bf 129}(5), pp. 537-546 (2003).
\شماره٪٪۱۹
Shi, J.J. ``Activity-based construction (ABC) modeling and
simulation
method'', {\it Journal of Construction Engineering and Management}, {\bf
125}(5),
pp. 354-360 (1999).
\شماره٪٪۲۰
Shewchuk, J.P. and Chang, T.-Ch. ``An approach to object-oriented
discrete-event simulation of manufacturing systems'', Institute
of Electrical and Electronics Engineers (IEEE), pp. 302-311 (1991).
\شماره٪٪۲۱
AbouRizk, S.M. and Hajjar, D. ``A framework for applying
simulation in the construction industry'', {\it Canadian Journal of
Civil Engineering}, {\bf 25}(3), pp. 604-617 (1998).
\شماره٪٪۲۲
AbouRizk, S.M. and Mohamed, Y. ``Simphony-an integrated
environment for construction simulation'', {\it Winter Simulation Conference
Proceedings} (2000).
\شماره٪٪۲۳
AbouRizk, S., Halpin, D., Mohamed, Y. and et al. ``Research
in modeling and simulation for improving construction engineering
operations'', {\it Journal of Construction Engineering and
Management}, {\bf 137}(10),
pp. 843-852 (2011).
\شماره٪٪۲۴
Hwang, S., Park, M., Lee, H.-S. and et al. ``Hybrid simulation
framework for immediate facility restoration planning after a
catastrophic disaster'', {\it Journal of Construction Engineering and
Management}, {\bf 142}(8), 04016026 (2016).
\شماره٪٪۲۵
Mohamed, Y., Borrego, D., Francisco, L. and et al.
``Simulation
of module assembly yards: case study'', {\it Engineering, Construction
and Architectural Management}, {\bf 14}(3), pp. 293-311 (2007).
\شماره٪٪۲۶
Seo, J., Lee, S.-H. and Seo, J. ``Simulation-based assessment
of workers' muscle fatigue and its impact on construction operations'',
{\it Journal
of Construction Engineering and Management}, {\bf 142}(11), 04016063
(2016).
\شماره٪٪۲۷
Zhang, H. ``Discrete-event simulation for estimating emissions
from construction processes'', {\it
Journal of Management in Engineering}, {\bf 31}(2),
04014034 (2015).
\شماره٪٪۲۸
Taghaddos, H., AbouRizk, S., Mohamed, Y. and et al.
``Integrated simulation-based scheduling for module assembly
yard'', In Construction Research Congress 2009: Building a Sustainable
Future, pp.1270-1279 (2009).
\شماره٪٪۲۹
Sherafat, B., Ahn, Ch.R., Akhavian, R. and et al.
``Automated methods for activity recognition of construction
workers and equipment: state-of-the-art review'', {\it Journal of Construction
Engineering and Management}, {\bf 146}(6), 03120002 (2020)
\شماره٪٪۳۰
Schmidtke, D., Heiser, U. and Hinrichsen, O. ``A simulation-enhanced
value stream mapping approach for optimisation of complex production
environments'', {\it International Journal of Production Research}, {\bf
52}(20),
pp. 6146-6160 (2014).
\شماره٪٪۳۱
BuHamdan, S., Alwisy, A., Bouferguene, A. and et al.
``Novel approach to overcoming discontinuity in knowledge:
application in value-adding frameworks in construction industry'', {\it Journal
of Construction Engineering and Management}, {\bf 145}(8), 04019045 (2019).
\شماره٪٪۳۲
Louis, J., Dunston, Ph. and Martinez, J. ``Automating construction
operations using discrete event simulation models'', In Construction
Research Congress 2014, Construction in a Global Network, pp.
1043-1052 (2014).
\شماره٪٪۳۳
Rosenbaum, S., Toledo, M. and Gonz\'{a}lez, V.
``Improving environmental
and production performance in construction projects using value-stream
mapping: case study'', {\it Journa