Document Type : Research Note
Authors
1 School of mining, College of Engineering University of Tehran
2 Dept. of Mining Engineering University of Kashan
Abstract
Keywords
Bakhshandeh Amnieh, H. , ZamZam, M. and Mousavi, E. (2015). EVALUATING FACE MINIMUM PRESSURE FOR URBAN TUNNELING USING AN EPB MACHINE AND ANALYTICAL AND NUMERICAL METHODS CASE STUDY: TUNNEL FOR LINE 7, TEHRAN SUBWAY (EAST-WES. Sharif Journal of Civil Engineering, 31.2(3.1), 137-145.
Bakhshandeh Amnieh, H. , , ZamZam, M. , and Mousavi, E. . "EVALUATING FACE MINIMUM PRESSURE FOR URBAN TUNNELING USING AN EPB MACHINE AND ANALYTICAL AND NUMERICAL METHODS CASE STUDY: TUNNEL FOR LINE 7, TEHRAN SUBWAY (EAST-WES", Sharif Journal of Civil Engineering, 31.2, 3.1, 2015, 137-145.
Bakhshandeh Amnieh, H., ZamZam, M., Mousavi, E. (2015). 'EVALUATING FACE MINIMUM PRESSURE FOR URBAN TUNNELING USING AN EPB MACHINE AND ANALYTICAL AND NUMERICAL METHODS CASE STUDY: TUNNEL FOR LINE 7, TEHRAN SUBWAY (EAST-WES', Sharif Journal of Civil Engineering, 31.2(3.1), pp. 137-145.
H. Bakhshandeh Amnieh , M. ZamZam and E. Mousavi, "EVALUATING FACE MINIMUM PRESSURE FOR URBAN TUNNELING USING AN EPB MACHINE AND ANALYTICAL AND NUMERICAL METHODS CASE STUDY: TUNNEL FOR LINE 7, TEHRAN SUBWAY (EAST-WES," Sharif Journal of Civil Engineering, 31.2 3.1 (2015): 137-145,
Bakhshandeh Amnieh, H., ZamZam, M., Mousavi, E. EVALUATING FACE MINIMUM PRESSURE FOR URBAN TUNNELING USING AN EPB MACHINE AND ANALYTICAL AND NUMERICAL METHODS CASE STUDY: TUNNEL FOR LINE 7, TEHRAN SUBWAY (EAST-WES. Sharif Journal of Civil Engineering, 2015; 31.2(3.1): 137-145.