Shahhosseini, V. , Sebt, M. and Hajarolasvadi, H. (2017). INTEGRATED PROJECT DELIVERY USING BUILDING INFORMATION MODELING. Sharif Journal of Civil Engineering, 33.2(1.1), 129-135. doi: 10.24200/j30.2017.2454
MLA
Shahhosseini, V. , , Sebt, M. , and Hajarolasvadi, H. . "INTEGRATED PROJECT DELIVERY USING BUILDING INFORMATION MODELING", Sharif Journal of Civil Engineering, 33.2, 1.1, 2017, 129-135. doi: 10.24200/j30.2017.2454
HARVARD
Shahhosseini, V., Sebt, M., Hajarolasvadi, H. (2017). 'INTEGRATED PROJECT DELIVERY USING BUILDING INFORMATION MODELING', Sharif Journal of Civil Engineering, 33.2(1.1), pp. 129-135. doi: 10.24200/j30.2017.2454
CHICAGO
V. Shahhosseini , M. Sebt and H. Hajarolasvadi, "INTEGRATED PROJECT DELIVERY USING BUILDING INFORMATION MODELING," Sharif Journal of Civil Engineering, 33.2 1.1 (2017): 129-135, doi: 10.24200/j30.2017.2454
VANCOUVER
Shahhosseini, V., Sebt, M., Hajarolasvadi, H. INTEGRATED PROJECT DELIVERY USING BUILDING INFORMATION MODELING. Sharif Journal of Civil Engineering, 2017; 33.2(1.1): 129-135. doi: 10.24200/j30.2017.2454